One or more photo(s) has been virtually staged. Pre-Construction. To be built. Brand new Maronda Homes Victoria M3 plan with estimated completion date of Nov 2024. CBS constructionwith full builder warranties. Terrific plan featuring large great room, stone accented front elevation, solid surface tops inkitchen, extensive ceramic tile flooring, refrigerator, blinds and much, much more.
O6195736
Residential - Single Family, Contemporary, 1 Story
3
2 Full
2023
Osceola
0.11
Acres
Public
1
Block,Stone,Stucco
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...